Statewide Oregon Road Conditions

Filters

Note: Available filter options are derived from active events; the absence of a filter option indicates no active events contain that information.

Current Travel Conditions By Route

Closure

I-5, 5 miles North of Oregon - California Border MP 5

THis is a test. A crash has occurred, use an alternate route.

This is a test.

Updated
6/15/2022 3:16:00 PM

Closure

ORE47, 1 mile North of Banks MP 83

Bridge work has the highway closed. Use alternate routes.

Northbound traffic can take OR 6 to southbound U.S. 26, use Exit 55 onto NW Dersham Road and left onto northbound U.S. 26. Southbound traffic can take U.S. 26 to OR 6.

Updated
5/24/2022 9:03:00 AM

Closure

I-84, 1 mile East of Portland, Intersection with 82nd Ave MP 6

Roadwork has the EB exit 7, to Halsey St., closed until late June 2022. Use an alternate route.
Updated
5/15/2022 9:48:00 PM

Weather Alert

Lower Columbia Basin, WA-Yakima Valley, WA-Lower Columbia Basin, WA-Blue Mnts Foothills

Heat Advisory

NOAA Issue Date: 6/25/2022 02:32:00 PM What High temperatures around 100 to 105 expected. Where In Washington, Yakima Valley, lower Columbia basin of Washington and foothills of the Blue Mountains of Washington. In Oregon, lower Columbia basin of Oregon. When From 11 AM to 11 PM PDT Monday. Impacts Hot temperatures may cause heat illnesses to occur. Precautionary/preparedness actions... Drink plenty of fluids, stay in an air-conditioned room, stay out of the sun, and check up on relatives and neighbors. Young children and pets should never be left unattended in vehicles under any circumstances. Take extra precautions if you work or spend time outside. When possible reschedule strenuous activities to early morning or evening. Know the signs and symptoms of heat exhaustion and heat stroke. Wear lightweight and loose fitting clothing when possible. To reduce risk during outdoor work, the occupational safety and health administration recommends scheduling frequent rest breaks in shaded or air conditioned environments. Anyone overcome by heat should be moved to a cool and shaded location. Heat stroke is an emergency! call 9 1 1.

Weather Alert

East Columbia Gorge, WA-East Columbia Gorge

Heat Advisory

NOAA Issue Date: 6/25/2022 02:32:00 PM What High temperatures around 99 to 102 expected. Where In Washington, eastern Columbia river gorge of Washington. In Oregon, eastern Columbia river gorge of Oregon. When From 11 AM Sunday to 11 PM PDT Monday. Impacts Hot temperatures may cause heat illnesses to occur. Precautionary/preparedness actions... Drink plenty of fluids, stay in an air-conditioned room, stay out of the sun, and check up on relatives and neighbors. Young children and pets should never be left unattended in vehicles under any circumstances. Take extra precautions if you work or spend time outside. When possible reschedule strenuous activities to early morning or evening. Know the signs and symptoms of heat exhaustion and heat stroke. Wear lightweight and loose fitting clothing when possible. To reduce risk during outdoor work, the occupational safety and health administration recommends scheduling frequent rest breaks in shaded or air conditioned environments. Anyone overcome by heat should be moved to a cool and shaded location. Heat stroke is an emergency! call 9 1 1.

Weather Alert

Central Douglas County, East Curry Co. & Josephine Co., Jackson Co.

Heat Advisory

NOAA Issue Date: 6/25/2022 02:03:00 PM What Hot temperatures of 95 to 105 in the valleys during the afternoons and 85 to 95 at usually cooler, hilly locations. Overnight lows will also be unusually warm, generally in the 60s. Where In California, the Klamath and Shasta valleys. In Oregon, central Douglas county including Roseburg, Tri-City, Tiller, Azalea, Glendale, Camas Valley, Sutherlin, Elkton, Drain, and Scottsburg. Also in Oregon, all of Jackson county, eastern Curry county and Josephine county including the Illinois Valley, Grants Pass, and Agness. When Until 11 PM PDT Monday. Impacts Hot temperatures may cause heat illnesses to occur. Additional details The hottest day of this heat wave is expected to be Sunday. On Monday the Heat Advisory area is likely to be smaller as temperatures cool slightly. This heat wave is likely to feel unusually hot to most due to fairly cool temperatures, thus far, this warm season. View the hazard area in detail at https://www.wrh.noaa.gov/map/?wfo=mfr Precautionary/preparedness actions... Drink plenty of fluids, stay in an air-conditioned room, stay out of the sun, and check up on relatives and neighbors. Young children and pets should never be left unattended in vehicles under any circumstances. Take extra precautions if you work or spend time outside. When possible reschedule strenuous activities to early morning or evening. Know the signs and symptoms of heat exhaustion and heat stroke. Wear lightweight and loose fitting clothing when possible. To reduce risk during outdoor work, the occupational safety and health administration recommends scheduling frequent rest breaks in shaded or air conditioned environments. Anyone overcome by heat should be moved to a cool and shaded location. Heat stroke is an emergency! call 9 1 1.

Weather Alert

South Central Cascades, Siskiyous & South Cascades, Klamath Basin

Heat Advisory

NOAA Issue Date: 6/25/2022 02:03:00 PM What Hot temperatures of 95 to 105 in the valleys during the afternoons and 85 to 95 at usually cooler mid-elevation locations. Overnight lows will also be much warmer than normal, generally in the mid 50s to lower 60s. Where In California, Dunsmuir, Mount Shasta city, Tennant, macdoel, Dorris, and Tulelake. In Oregon, portions of the south central Oregon Cascades, Siskiyou mountains, and southern Oregon Cascades including Crescent Lake, Union Creek, and Howard Prairie. Also, much of the upper Klamath basin including Keno, Klamath Falls, Bonanza, and Chiloquin. When Until 11 PM PDT Monday. Impacts Hot temperatures may cause heat illnesses to occur. Additional details The hottest day of this heat wave is expected to be Sunday. On Monday the Heat Advisory area is likely to be smaller as temperatures cool slightly. This heat wave is likely to feel unusually hot to most due to fairly cool temperatures, thus far, this warm season. View the hazard area in detail at https://www.wrh.noaa.gov/map/?wfo=mfr Precautionary/preparedness actions... Drink plenty of fluids, stay in an air-conditioned room, stay out of the sun, and check up on relatives and neighbors. Young children and pets should never be left unattended in vehicles under any circumstances. Take extra precautions if you work or spend time outside. When possible reschedule strenuous activities to early morning or evening. Know the signs and symptoms of heat exhaustion and heat stroke. Wear lightweight and loose fitting clothing when possible. To reduce risk during outdoor work, the occupational safety and health administration recommends scheduling frequent rest breaks in shaded or air conditioned environments. Anyone overcome by heat should be moved to a cool and shaded location. Heat stroke is an emergency! call 9 1 1.

Weather Alert

North & East Klamath Co. & West Lake Co., Central & East Lake Co.

Heat Advisory

NOAA Issue Date: 6/25/2022 02:03:00 PM What Hot temperatures from the upper 80s to 100 in the valleys during the afternoons. Overnight lows will also be much warmer than normal, generally in the 50s. Where In California, all except the higher mountains of Modoc county. In Oregon, northern and eastern Klamath county and western Lake county and central and eastern Lake county including Lakeview, Adel, Bly, Beatty, Sprague river, silver Lake, summer Lake, Chemult, and Crescent. When From 11 AM Sunday to 11 PM PDT Monday. Impacts Hot temperatures may cause heat illnesses to occur. Additional details This heat wave is likely to feel unusually hot to most due to fairly cool temperatures, thus far, this warm season. View the hazard area in detail at https://www.wrh.noaa.gov/map/?wfo=mfr Precautionary/preparedness actions... Drink plenty of fluids, stay in an air-conditioned room, stay out of the sun, and check up on relatives and neighbors. Young children and pets should never be left unattended in vehicles under any circumstances. Take extra precautions if you work or spend time outside. When possible reschedule strenuous activities to early morning or evening. Know the signs and symptoms of heat exhaustion and heat stroke. Wear lightweight and loose fitting clothing when possible. To reduce risk during outdoor work, the occupational safety and health administration recommends scheduling frequent rest breaks in shaded or air conditioned environments. Anyone overcome by heat should be moved to a cool and shaded location. Heat stroke is an emergency! call 9 1 1.

Weather Alert

South Central Coast, Curry Co. Coast

Heat Advisory

NOAA Issue Date: 6/25/2022 02:03:00 PM What Hot temperatures of 85 to 100 in the advisory area. Overnight lows will also be unusually warm, in the 60s to lower 70s. Where Myrtle Point, Powers, and higher elevations away from the coast. When Until 11 PM PDT Sunday. Impacts Hot temperatures may cause heat illnesses to occur. Additional details The hottest day of this heat wave for the coastal counties is expected to be Saturday. This heat wave is likely to feel unusually hot to most due to fairly cool temperatures, thus far, this warm season. View the hazard area in detail at https://www.wrh.noaa.gov/map/?wfo=mfr Precautionary/preparedness actions... Drink plenty of fluids, stay in an air-conditioned room, stay out of the sun, and check up on relatives and neighbors. Young children and pets should never be left unattended in vehicles under any circumstances. Take extra precautions if you work or spend time outside. When possible reschedule strenuous activities to early morning or evening. Know the signs and symptoms of heat exhaustion and heat stroke. Wear lightweight and loose fitting clothing when possible. To reduce risk during outdoor work, the occupational safety and health administration recommends scheduling frequent rest breaks in shaded or air conditioned environments. Anyone overcome by heat should be moved to a cool and shaded location. Heat stroke is an emergency! call 9 1 1.

Weather Alert

Douglas Co. East Foothills

Heat Advisory

NOAA Issue Date: 6/25/2022 02:03:00 PM What Hot temperatures of 95 to 105 in the valleys during the afternoons and 85 to 95 at usually cooler hilly locations. Overnight lows will also be unusually warm, generally in the 60s. Where In California, the valleys and hills of western Siskiyou county, including the Klamath and scott river valleys. In Oregon, the eastern Douglas county foothills including Toketee Falls and Steamboat. When Until 11 PM PDT Sunday. Impacts Hot temperatures may cause heat illnesses to occur. Additional details The hottest day of this heat wave is expected to be Sunday. This heat wave is likely to feel unusually hot to most due to fairly cool temperatures, thus far, this warm season. View the hazard area in detail at https://www.wrh.noaa.gov/map/?wfo=mfr Precautionary/preparedness actions... Drink plenty of fluids, stay in an air-conditioned room, stay out of the sun, and check up on relatives and neighbors. Young children and pets should never be left unattended in vehicles under any circumstances. Take extra precautions if you work or spend time outside. When possible reschedule strenuous activities to early morning or evening. Know the signs and symptoms of heat exhaustion and heat stroke. Wear lightweight and loose fitting clothing when possible. To reduce risk during outdoor work, the occupational safety and health administration recommends scheduling frequent rest breaks in shaded or air conditioned environments. Anyone overcome by heat should be moved to a cool and shaded location. Heat stroke is an emergency! call 9 1 1.

Weather Alert

Lower Columbia, Portland Metro, Hood River Valley, Western Columbia River, Central Columbia River, WA-Vancouver Area

Heat Advisory

NOAA Issue Date: 6/25/2022 01:47:00 PM What Temperatures 90 to 100 expected. Where In Oregon, lower Columbia, greater Portland metro area, upper Hood River Valley, western Columbia river gorge and central Columbia river gorge. In Washington, greater Vancouver area, western Columbia river gorge and central Columbia river gorge. When Through 10 PM PDT Monday. Impacts Hot temperatures may cause heat illnesses to occur. Rivers are running cold and fast, and will continue to do so this weekend. Nearly every year, people die in rivers in southwest Washington and northwest Oregon due to cold water shock during the season's first heat wave. Hot temperatures can make the cool water seem tempting, but river temperatures in the 50s can easily result in cold water shock that can kill in minutes. Additional details Sunday will be the hottest day with highs in the mid to upper 90s, locally to 102. Maximum temperatures Monday are expected to be 90 to 95. Nighttime temperatures are expected to be in the upper 50s to upper 60s. Precautionary/preparedness actions... Drink plenty of fluids, stay in an air-conditioned room, stay out of the sun, and check up on relatives and neighbors. Young children and pets should never be left unattended in vehicles under any circumstances. Take extra precautions if you work or spend time outside. When possible reschedule strenuous activities to early morning or evening. Know the signs and symptoms of heat exhaustion and heat stroke. Wear lightweight and loose fitting clothing when possible. To reduce risk during outdoor work, the occupational safety and health administration recommends scheduling frequent rest breaks in shaded or air conditioned environments. Anyone overcome by heat should be moved to a cool and shaded location. Heat stroke is an emergency! call 9 1 1.

Weather Alert

North Cascades, Lane Co. Cascades, WA-South Cascades

Heat Advisory

NOAA Issue Date: 6/25/2022 01:47:00 PM What Temperatures 80 to 90 expected. Where In Oregon, northern Oregon Cascades and Cascades in Lane county. In Washington, south Washington Cascades. When Through 10 PM PDT Sunday. Impacts Hot temperatures may cause heat illnesses to occur. Rivers are running cold and fast, and will continue to do so this weekend. Nearly every year, people die in rivers in southwest Washington and northwest Oregon due to cold water shock during the season's first heat wave. Hot temperatures can make the cool water seem tempting, but river temperatures in the 50s can easily result in cold water shock that can kill in minutes. Additional details Sunday will be the hottest day, with highs generally in the lower 80s. However, the lowest valleys are likely to be in the mid 80s to lower 90s. Overnight temperatures will be in the mid 50s to mid 60s, but locally to 70 on mid and upper slopes. Precautionary/preparedness actions... Drink plenty of fluids, stay in an air-conditioned room, stay out of the sun, and check up on relatives and neighbors. Young children and pets should never be left unattended in vehicles under any circumstances. Take extra precautions if you work or spend time outside. When possible reschedule strenuous activities to early morning or evening. Know the signs and symptoms of heat exhaustion and heat stroke. Wear lightweight and loose fitting clothing when possible. To reduce risk during outdoor work, the occupational safety and health administration recommends scheduling frequent rest breaks in shaded or air conditioned environments. Anyone overcome by heat should be moved to a cool and shaded location. Heat stroke is an emergency! call 9 1 1.

Weather Alert

North Coast, Central Coast, WA-South Coast

Heat Advisory

NOAA Issue Date: 6/25/2022 01:47:00 PM What Temperatures 80 to 90 expected. Where In Oregon, north Oregon coast and central Oregon coast. In Washington, south Washington coast. When Through 10 PM PDT Sunday. Impacts Hot temperatures may cause heat illnesses to occur. Rivers are running cold and fast, and will continue to do so this weekend. Nearly every year, people die in rivers in southwest Washington and northwest Oregon due to cold water shock during the season's first heat wave. Hot temperatures can make the cool water seem tempting, but river temperatures in the 50s can easily result in cold water shock that can kill in minutes. Additional details Main location of concern is for inland areas away from the immediate coast. Sunday will be the hottest day, with inland highs generally 85 to 95. Coastal communities north of Newport are likely to reach the mid to upper 80s Sunday. Overnight temperatures are likely to fall into mid 50s to mid 60s. Precautionary/preparedness actions... Drink plenty of fluids, stay in an air-conditioned room, stay out of the sun, and check up on relatives and neighbors. Young children and pets should never be left unattended in vehicles under any circumstances. Take extra precautions if you work or spend time outside. When possible reschedule strenuous activities to early morning or evening. Know the signs and symptoms of heat exhaustion and heat stroke. Wear lightweight and loose fitting clothing when possible. To reduce risk during outdoor work, the occupational safety and health administration recommends scheduling frequent rest breaks in shaded or air conditioned environments. Anyone overcome by heat should be moved to a cool and shaded location. Heat stroke is an emergency! call 9 1 1.

Weather Alert

Northwest Coast Range, West Coast Range, Central Willamette Valley, South Willamette Valley, North Cascade Foothills, Lane Co. Cascade Foothills, WA-Willapa Hills, WA-Lower Columbia & I-5 Cowlitz Co., WA-South Cascade Foothills

Heat Advisory

NOAA Issue Date: 6/25/2022 01:47:00 PM What Temperatures in the 90s expected. Where In Oregon, coast range of northwest Oregon, central coast range of western Oregon, central Willamette Valley, south Willamette Valley, northern Oregon Cascade foothills and Cascade foothills in Lane county. In Washington, Willapa hills, i- 5 corridor in Cowlitz county and south Washington Cascade foothills. When Through 10 PM PDT Sunday. Impacts Hot temperatures may cause heat illnesses to occur. Rivers are running cold and fast, and will continue to do so this weekend. Nearly every year, people die in rivers in southwest Washington and northwest Oregon due to cold water shock during the season's first heat wave. Hot temperatures can make the cool water seem tempting, but river temperatures in the 50s can easily result in cold water shock that can kill in minutes. Additional details Sunday will be the hottest day, with highs generally in the mid to upper 90s. Nighttime temperatures are expected to be in the mid 50s to mid 60s. Precautionary/preparedness actions... Drink plenty of fluids, stay in an air-conditioned room, stay out of the sun, and check up on relatives and neighbors. Young children and pets should never be left unattended in vehicles under any circumstances. Take extra precautions if you work or spend time outside. When possible reschedule strenuous activities to early morning or evening. Know the signs and symptoms of heat exhaustion and heat stroke. Wear lightweight and loose fitting clothing when possible. To reduce risk during outdoor work, the occupational safety and health administration recommends scheduling frequent rest breaks in shaded or air conditioned environments. Anyone overcome by heat should be moved to a cool and shaded location. Heat stroke is an emergency! call 9 1 1.

I-205: MP 12.94

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from OR212/OR224 (Estacada) Effective February 11, 2019, the I-205 northbound on-ramp from OR212/OR224 will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM & 8 AM.
Last Updated
6/25/2022 10:00 AM

I-205: MP 13.6

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from OR224/Sunrise Expressway (Milwaukie) Effective February 11, 2019, the I-205 northbound on-ramp from OR224/Sunrise Expressway will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM & 8 AM.
Last Updated
6/25/2022 10:00 AM

I-205: MP 13.95

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 14 to Sunnybrook Blvd (Milwaukie) Effective February 11, 2019, the I-205 northbound Exit 14 to Sunnybrook Blvd will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 10 PM & 7 AM; and Saturday nights between 10 PM & 8 AM.
Last Updated
6/25/2022 10:00 AM

I-205: MP 14.31 to 13.39

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 13.45 to MP 14.17 (Clackamas) Effective February 11, 2019, this section of I-205 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; and Saturday nights between the hours of 11 PM & 8 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-base basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
6/25/2022 10:00 AM

I-205: MP 14.31 to 13.39

Commercial Vehicle Information
Informational only
Details
I-205 NB MP 13.39 to MP 14.1 (Clackamas) Effective February 11, 2019, this section of I-205 northbound crossing under SE 82nd Dr will be restricted to 18 feet 06 inches in height and 18 feet 10 inches in height crossing under Sunnybrook Blvd Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; and Saturday nights between the hours of 11 PM & 8 AM.
Last Updated
6/25/2022 10:00 AM

I-205: MP 14.31 to 13.39

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 13.45 to MP 14.17 (Clackamas) Effective February 11, 2019, this section of I-205 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; and Saturday nights between the hours of 11 PM & 8 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-base basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
6/25/2022 10:00 AM

I-205: MP 14.31 to 13.39

Commercial Vehicle Information
Informational only
Details
I-205 NB MP 13.39 to MP 14.1 (Clackamas) Effective February 11, 2019, this section of I-205 northbound crossing under SE 82nd Dr will be restricted to 18 feet 06 inches in height and 18 feet 10 inches in height crossing under Sunnybrook Blvd Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; and Saturday nights between the hours of 11 PM & 8 AM.
Last Updated
6/25/2022 10:00 AM

I-205: MP 14.32 to 13.39

Commercial Vehicle Information
Informational only
Details
I-205 SB MP 14.17 to MP 13.45 (Clackamas) Effective February 11, 2019, this section of I-205 southbound crossing under SE 82nd Dr will be restricted to 17 feet 00 inches in height Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; and Saturday nights between the hours of 11 PM & 8 AM.
Last Updated
6/25/2022 10:00 AM

I-205: MP 16.2 to 25.58

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 15.97 to MP 25.70 (Portland) Effective April 15, 2018, this section of I-205 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM to 1/2 hour before sunrise. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
6/25/2022 10:00 AM

I-205: MP 16.2 to 25.58

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 15.97 to MP 25.70 (Portland) Effective April 15, 2018, this section of I-205 northbound and southbound will be restricted to 19 feet 00 inches in width from 1/2 hour before sunrise to 1/2 hour after sunset. Loads wider than 19 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
6/25/2022 10:00 AM

I-205: MP 16.2 to 25.58

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 15.97 to MP 25.70 (Portland) Effective April 15, 2018, this section of I-205 southbound will be restricted to 16 feet 5 inches in height and 16 feet 7 inches in height northbound. Loads higher may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
6/25/2022 10:00 AM

I-205: MP 16.2 to 25.58

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 15.97 to MP 25.70 (Portland) Effective April 15, 2018, this section of I-205 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM to 1/2 hour before sunrise. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
6/25/2022 10:00 AM

I-205: MP 16.2 to 25.58

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 15.97 to MP 25.70 (Portland) Effective April 15, 2018, this section of I-205 northbound and southbound will be restricted to 19 feet 00 inches in width from 1/2 hour before sunrise to 1/2 hour after sunset. Loads wider than 19 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
6/25/2022 10:00 AM

I-205: MP 16.2 to 25.58

Commercial Vehicle Information
Informational only
Details
I-205 NB & SB MP 15.97 to MP 25.70 (Portland) Effective April 15, 2018, this section of I-205 southbound will be restricted to 16 feet 5 inches in height and 16 feet 7 inches in height northbound. Loads higher may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
6/25/2022 10:00 AM

I-205: MP 20.02

Commercial Vehicle Information
Informational only
Details
I-205 SB Exit 19 (US26/Division St/Powell Blvd - Portland) Effective May 28, 2018, the I-205 southbound ramp (Exit 19) to US26/Division St/Powell Blvd will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM.
Last Updated
6/25/2022 10:00 AM

I-205: NB MP 20.6

Construction Work
Informational only
Comments
Nighttime lane closures on Washington Street over I-205 and traffic lane shifts.
Last Updated
5/27/2022 2:16 PM

I-205: MP 22.63

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from I-84 EB (Portland) Effective June 18, 2018, the I-205 northbound on-ramp from I-84 eastbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM.
Last Updated
6/25/2022 10:00 AM

I-205: MP 22.86

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from I-84 WB (Portland) Effective June 19, 2018, the I-205 northbound on-ramp from I-84 westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM.
Last Updated
6/25/2022 10:00 AM

I-205: MP 23.21

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 23A to US30 Bypass EB (Portland) Effective June 19, 2018, I-205 northbound Exit 23A ramp to US30 Bypass eastbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM.
Last Updated
6/25/2022 10:00 AM

I-205: MP 23.62

Commercial Vehicle Information
Informational only
Details
I-205 NB Exit 23B to US30 Bypass WB (Portland) Effective June 20, 2018, the I-205 northbound Exit 23B ramp to US30 Bypass westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM.
Last Updated
6/25/2022 10:00 AM

I-205: MP 23.96

Commercial Vehicle Information
Informational only
Details
I-205 SB Exit 23B to US30 Bypass WB (Portland) Effective March 1, 2019, the I-205 southbound exit 23B ramp to US30 Bypass westbound will be closed between the hours of 10 PM & 6 AM.
Last Updated
6/25/2022 10:00 AM

I-405: MP 1.24

Commercial Vehicle Information
Informational only
Details
I-405 NB Exit 1D to US26/SW 12th Ave (Portland) Effective February 8, 2019, the I-405 northbound exit 1D to US26 will be closed between the hours of 9 PM & 6 AM.
Last Updated
6/25/2022 10:00 AM

I-5: MP 0.69

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 0.69 (Test) Effective August 20, 2020, this section of I-5 SB will be closed Monday through Friday nights between the hours of 10 PM & 4 AM. The estimated completion date for this project is August 30, 2020.
Last Updated
6/25/2022 10:00 AM

I-5: MP 0.95

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 0.95 (Test) Effective January 10, 2020, this section of I-5 SB will be closed Monday through Friday nights between the hours of 10 PM & 4 AM. The estimated completion date for this project is January 30, 2020.
Last Updated
6/25/2022 10:00 AM

I-5: MP 4.32

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 4.32 (Test) Effective April 1, 2020, this section of I-5 northbound and southbound will be closed Monday through Thursday nights between the hours of 10 PM & 5 AM. The estimated completion date for this project is April 2, 2020.
Last Updated
6/25/2022 10:00 AM

I-5: NB MP 5

Crash/Hazard
Closure
Lanes Affected
(Northbound) Median , 2 Lanes
Comments
THis is a test. A crash has occurred, use an alternate route. This is a test.
Last Updated
6/15/2022 3:16 PM

I-5: MP 104.85

Commercial Vehicle Information
Informational only
Details
I-5 MP 104.85 Chadwick Ln crossing over I-5 (near Riddle) Chadwick Ln crossing over I-5 is restricted to the following weights: 20,000 single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW. Weight Table 1.
Last Updated
6/25/2022 10:00 AM

I-5: MP 117.74 to 125.36

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 117.70 to MP 125.40 (Roseburg) Test! THANK YOU LESLIE! Effective February 25, 2019, this section of I-5 northbound and southbound will be restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 8 PM & 5 AM. Loads wider than 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
6/25/2022 10:00 AM

I-5: MP 151.81

Commercial Vehicle Information
Informational only
Details
I-5 MP 151.81 Wilson Rd crossing over I-5 (Yoncalla) Wilson Rd crossing over I-5 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
6/25/2022 10:00 AM

I-5: MP 259.97 to 259.961

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 259.97 to MP 259.961 (Salem) Test Effective April 29, 2019, this section of I-5 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 8 PM & 5 AM. Loads wider than 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is May 31, 2019. Test Test
Last Updated
6/25/2022 10:00 AM

I-5: MP 260.22

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 260 (Salem) Effective February 28, 2019, this section of I-5 northbound under Chemawa Rd at MP 260.20 will be restricted to 17 feet 03 inches in height between the hours of 11 PM & 4 AM.
Last Updated
6/25/2022 10:00 AM

I-5: MP 283.11 to 288.51

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 283.21 to 288.50 (Wilsonville) Effective February 10, 2019, this section of I-5 northbound and southbound will be restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM. Loads wider than 16 feet 00 inches in width can be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
6/25/2022 10:00 AM

I-5: MP 283.11 to 288.51

Commercial Vehicle Information
Informational only
Details
I-5 SB & NB MP 288.50 to MP 283.21 (Wilsonville) - Testing x 4 Effective February 10, 2019, this section of I-5 northbound will be restricted to 16 feet 11 inches in height and 17 feet 06 inches inches in height southbound Sunday through Thursday nights between the hours of 9 PM & 5 AM.
Last Updated
6/25/2022 10:00 AM

I-5: MP 288.48 to 289.92

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 288.00 to MP 290.00 (Tualatin) Effective February 21, 2018 this section of I-5 southbound will be restricted to 16 feet 00 inches in height Sunday through Thursday nights 8 PM to 5:30 AM; Friday nights 8 PM to 8 AM; and Saturday nights 8 PM to 9 AM.
Last Updated
6/25/2022 10:00 AM

I-5: MP 288.97

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 288 to I-205 NB (Portland) Effective July 22, 2018, the I-5 southbound ramp to I-205 northbound will be intermittently closed Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; and Saturday nights between the hours of 11 PM & 8 AM. Test
Last Updated
6/25/2022 10:00 AM

I-5: MP 289.27 to 289.75

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB Exit 289 on- and off-ramps to/from Nyberg St (Tualatin) THANK YOU LESLIE! Effective July 12, 2018, the I-5 NB & SB Exit 289 on- and off-ramps to/from Nyberg St will be intermittently closed per the following schedule: Sunday to Thursday nights from 10 PM to 5 AM; Friday nights from 11 PM to 7 AM; Saturday nights from 11 PM to 8 AM.
Last Updated
6/25/2022 10:00 AM

I-5: MP 290.25 to 290.7

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB Exit 290 on- and off-ramps to/from Lower Boones Ferry Rd (Tualatin) Effective July 12, 2018, the I-5 NB & SB Exit 290 on- and off-ramps to/from Lower Boones Ferry Rd will be intermittently closed per the following schedule: Sunday to Thursday nights from 10 PM to 5 AM; Friday nights from 11 PM to 7 AM; Saturday nights from 11 PM to 8 AM.
Last Updated
6/25/2022 10:00 AM

I-5: MP 291.02 to 291.5

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB Exit 291 on- and off-ramps to/from Carman Dr (Tigard) Effective July 12, 2018, the I-5 NB & SB Exit 291 on- and off-ramps to/from Carman Dr will be intermittently closed on Sunday to Thursday nights between the hours of 9 PM and 5:30 AM.
Last Updated
6/25/2022 10:00 AM

I-5: MP 291.89

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 292A to OR217 (Tigard) Effective July 22, 2018, the I-5 northbound ramp to OR217 (Exit 292A) will be intermittently closed Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; and Saturday nights between the hours of 11 PM & 8 AM.
Last Updated
6/25/2022 10:00 AM

I-5: MP 292.12

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 292B to Kruse Way (Tigard) Effective July 12, 2018, the I-5 NB Exit 292B ramp to Kruse Way will be intermittently closed per the following schedule: Sunday to Thursday nights from 10 PM to 5 AM; Friday nights from 11 PM to 7 AM; Saturday nights from 11 PM to 8 AM.
Last Updated
6/25/2022 10:00 AM

I-5: MP 292.54

Commercial Vehicle Information
Informational only
Details
I-5 NB on-ramp from SB OR217 / Kruse Way (Tigard) Effective July 12, 2018, the ramp from SB OR217 / Kruse Way to I-5 NB will be intermittently closed per the following schedule: Sunday to Thursday nights from 10 PM to 5 AM; Friday nights from 11 PM to 7 AM; Saturday nights from 11 PM to 8 AM.
Last Updated
6/25/2022 10:00 AM

I-5: MP 292.56 to 291.86

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 292 on- and off-ramps to/from OR217/Kruse Way (Tigard) Effective July 22, 2018, the I-5 SB Exit 292 on- and off-ramps to/from OR217/Kruse Way will be intermittently closed per the following schedule: Sunday through Thursday nights from 10 PM to 5 AM; Friday nights from 11 PM to 7 AM; Saturday nights from 11 PM to 8 AM.
Last Updated
6/25/2022 10:00 AM

I-5: MP 292.86 to 293.28

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 293 on- and off-ramps to/from Haines St (Tigard) Effective October 23, 2018, the I-5 SB Exit 293 on- and off-ramps to/from Haines St will be intermittently closed on Sunday to Thursday nights between the hours of 8 PM and 5 AM.
Last Updated
6/25/2022 10:00 AM

I-5: MP 294.04 to 293.56

Commercial Vehicle Information
Informational only
Details
I-5 SB Exit 294 on- and off-ramps to/from OR99W/Barbur Blvd (Tigard) Effective October 23, 2018, the I-5 SB Exit 294 on- and off-ramps to/from OR99W/Barbur Blvd will be intermittently closed per the following schedule: Sunday through Thursday nights from 10 PM to 5 AM; Friday nights from 11 PM to 7 AM; Saturday nights from 11 PM to 8 AM.
Last Updated
6/25/2022 10:00 AM

I-5: MP 300.66

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 300 to I-84 EB (Portland) Effective February 1, 2019, the I-5 northbound off-ramp to I-84 eastbound will be restricted to 15 feet 00 inches in height Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 10 PM & 7 AM.
Last Updated
6/25/2022 10:00 AM

I-5: MP 300.66

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 300 to I-84 EB (Portland) Effective February 1, 2019, the I-5 northbound off-ramp to I-84 eastbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 10 PM & 7 AM. Loads wider than 12 feet 00 inches in width can be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
6/25/2022 10:00 AM

I-5: MP 300.66

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 300 to I-84 EB (Portland) Effective February 1, 2019, the I-5 northbound off-ramp to I-84 eastbound will be restricted to 15 feet 00 inches in height Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 10 PM & 7 AM.
Last Updated
6/25/2022 10:00 AM

I-5: MP 300.66

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 300 to I-84 EB (Portland) Effective February 1, 2019, the I-5 northbound off-ramp to I-84 eastbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 10 PM & 7 AM. Loads wider than 12 feet 00 inches in width can be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
6/25/2022 10:00 AM

I-5: MP 300.66

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 300 to I-84 EB (Portland) Effective February 1, 2019, the I-5 northbound off-ramp to I-84 eastbound will be restricted to 15 feet 00 inches in height Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 10 PM & 7 AM.
Last Updated
6/25/2022 10:00 AM

I-5: MP 300.66

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 300 to I-84 EB (Portland) Effective February 1, 2019, the I-5 northbound off-ramp to I-84 eastbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 10 PM & 7 AM. Loads wider than 12 feet 00 inches in width can be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
6/25/2022 10:00 AM

I-5: MP 301.911

Commercial Vehicle Information
Informational only
Details
I-5 SB to I-84 EB (Exit 301 - Portland) Effective September 20, 2018, the I-5 southbound off-ramp to I-84 eastbound will be closed Monday through Thursday nights between the hours of 10 PM & 5 AM. In addition, starting Friday nights at 10 PM, this ramp will be closed at all hours, until 5 AM Monday mornings.
Last Updated
6/25/2022 10:00 AM

I-5: MP 303.76 to 304.07

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB Exit 303 (Swan Island/N Going St - Portland) Effective July 23, 2018, the I-5 northbound and southbound on/off ramps (Exit 303) will be intermittently closed Sunday through Saturday nights between the hours of 9 PM & 5 AM.
Last Updated
6/25/2022 10:00 AM

I-5: MP 303.95

Commercial Vehicle Information
Informational only
Details
I-5 SB on-ramp from Alberta St (Portland) - Testing 7? Effective July 27, 2018, the I-5 southbound on-ramp from Alberta St will be intermittently closed Sunday through Saturday nights between the hours of 9 PM & 5 AM.
Last Updated
6/25/2022 10:00 AM

I-5: SB MP 304.19 to 304.22

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
6/23/2022 1:08 PM

I-5: MP 304.5

Commercial Vehicle Information
Informational only
Details
I-5 NB on-ramp from Alberta St (Portland) Effective July 27, 2018, the I-5 northbound on-ramp from Alberta St will be intermittently closed Sunday through Saturday nights between the hours of 9 PM & 5 AM.
Last Updated
6/25/2022 10:00 AM

I-5: MP 304.75 to 305.12

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB Exit 304 (Rosa Parks - Portland) Effective August 13, 2018, the I-5 northbound and southbound on and off ramps to Rosa Parks Way will be will be intermittently closed Sunday through Saturday nights between the hours of 9 PM & 5 AM.
Last Updated
6/25/2022 10:00 AM

I-5: MP 305.24 to 305.4

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB on/off ramps to US30 Bypass (Portland) Effective July 17, 2018, the I-5 northbound and southbound on/off ramps to/from US30 Bypass will be intermittently closed Sunday through Saturday nights between the hours of 9 PM & 5 AM.
Last Updated
6/25/2022 10:00 AM

I-5: MP 306.97 to 306.51

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 306.50 to MP 307.50 (Victory Blvd/Hwy 091 Portland) Effective August 3, 2018, the I-5 northbound and southbound on/off ramps to/from Victory Blvd/Hwy 091 will be intermittently closed Sunday through Saturday nights between the hours of 9 PM & 5 AM.
Last Updated
6/25/2022 10:00 AM

I-5: MP 307.14 to 307.471

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB Exit 307 (Marine Dr/OR99E - Portland) Effective September 12, 2018, the I-5 northbound and southbound on/off ramps to/from Marine Dr/OR99E will be intermittently closed Sunday through Saturday nights between the hours of 9 PM & 5 AM.
Last Updated
6/25/2022 10:00 AM

I-84: MP 0.37

Commercial Vehicle Information
Informational only
Details
I-84 WB to I-5 SB (Portland) Effective November 26, 2018, the I-84 westbound ramp to I-5 southbound will be closed Monday through Thursday nights between 10 PM & 5 AM. Starting Friday night at 10 PM, this ramp will be closed at all hours until Monday morning at 5 AM.
Last Updated
6/25/2022 10:00 AM

I-84: WB MP 2 to 9.7

Construction Work
Estimated delay under 20 minutes
Comments
I-84 east Exit 7 closed May 8-June 24. Shoulder closure on I-205 north between Glisan Street and Exit 22, on I-84 east and west. Shoulder closure on I-205 north between Glisan Street and Exit 22, on I-84 east and west and Exit 7.
Last Updated
6/03/2022 2:19 PM

I-84: EB MP 5.75

Maintenance Work
Closure
Lanes Affected
(Eastbound) Median , 1 Lane , Shoulder
Comments
Roadwork has the EB exit 7, to Halsey St., closed until late June 2022. Use an alternate route.
Last Updated
5/15/2022 9:48 PM

I-84: WB MP 7.2 to 5.5

Construction Work
Informational only
Comments
I-84 west will be closed at I-205 for several nights and a full weekend in June. Weekend closure 10 p.m. Friday, June 24 to 4 a.m. Monday, June 27. Overnight closures begin at 10 p.m. June 22, 23, 27, 28 and 29 and end at 4 a.m. the following morning
Last Updated
6/08/2022 8:55 AM

I-84: MP 17.67 to 16.9

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 17.12 to MP 17.60 (Troutdale) Effective January 28, 2019, this section of I-84 eastbound and westbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM and 5:30 AM and Friday and Saturday nights between the hours of 10 PM and 1/2 hour before sunrise. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
6/25/2022 10:00 AM

I-84: MP 17.67 to 16.9

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 17.12 to MP 17.60 (Troutdale) Effective January 28, 2019, this section of I-84 eastbound will be restricted to 18 feet 03 inches in height and 18 feet 02 inches in height westbound Sunday through Thursday nights between the hours of 10 PM and 5:30 AM and Friday and Saturday nights between the hours of 10 PM and 1/2 hour before sunrise.
Last Updated
6/25/2022 10:00 AM

I-84: MP 17.67 to 16.9

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 17.12 to MP 17.60 (Troutdale) Effective January 28, 2019, this section of I-84 eastbound and westbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM and 5:30 AM and Friday and Saturday nights between the hours of 10 PM and 1/2 hour before sunrise. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
6/25/2022 10:00 AM

I-84: MP 17.67 to 16.9

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 17.12 to MP 17.60 (Troutdale) Effective January 28, 2019, this section of I-84 eastbound will be restricted to 18 feet 03 inches in height and 18 feet 02 inches in height westbound Sunday through Thursday nights between the hours of 10 PM and 5:30 AM and Friday and Saturday nights between the hours of 10 PM and 1/2 hour before sunrise.
Last Updated
6/25/2022 10:00 AM

I-84: WB MP 31.77 to 46

Construction Work
Estimated delay under 20 minutes
Comments
Periodic nighttime lane closures from 7 p.m. to 7 a.m. between Multnomah Falls and Cascade Locks Sunday through Thursday. Daytime shoulder closures.
Last Updated
6/03/2022 2:20 PM

I-84: EB MP 41.48

Construction Work
Informational only
Off Ramp
Comments
I-84 east Exit 41 to Eagle Creek has shoulders closed and lanes narrowed. Drive with care. Ramps Affected.
Last Updated
5/13/2022 1:27 PM

I-84: WB MP 46.5 to 44

Construction Work
Estimated delay under 20 minutes
Comments
Forest Lane Bridge closed over I-84. Flaggers directing traffic on Frontage Road at the bridge weekdays.
Last Updated
6/03/2022 2:20 PM

I-84: EB MP 58.39 to 59

Construction Work
Closure
Off Ramp
Comments
I-84 Exit 58 to Mitchell Point Overlook closed around-the-clock. No more rolling slowdowns. Ramps Affected.
Last Updated
6/03/2022 2:21 PM

I-84: WB MP 59 to 61

Construction Work
Estimated delay under 20 minutes
Comments
No traffic impacts.
Last Updated
6/03/2022 2:21 PM

I-84: MP 64.11

Commercial Vehicle Information
Informational only
Details
I-84 EB on-ramp from 2nd St (Hood River) Effective February 13, 2019, the I-84 eastbound on-ramp from 2nd Street will be closed between the hours of 7 AM to 4 PM.
Last Updated
6/25/2022 10:00 AM

I-84: MP 64.11 to 64.15

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 64.11 to MP 64.15 (Hood River) Effective February 13, 2019, this section of I-84 eastbound will be restricted to 14 feet 00 inches in width between the hours of 7 AM to 4 PM.
Last Updated
6/25/2022 10:00 AM

I-84: MP 99.85 to 63.92

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 64.00 to MP 100.00 Effective January 16, 2019 this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width between the hours of 7 PM & 10 AM. Loads wider than 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
6/25/2022 10:00 AM

I-84: MP 104.56

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 104.56 (Biggs Junction) Effective February 25, 2019, this section of I-84 westbound crossing under US97 at Exit 104, will be restricted to 17 feet 10 inches in height Monday through Friday between the hours of 5 AM & 10 PM.
Last Updated
6/25/2022 10:00 AM

I-84: MP 104.78

Commercial Vehicle Information
Informational only
Details
I-84 WB Exit 104 off-ramp to US97 (Biggs) Effective January 16, 2019, the westbound I-84 off-ramp to US97 (Exit 104) will be restricted to 16 feet 00 inches in width at all hours.
Last Updated
6/25/2022 10:00 AM

I-84: MP 104.83

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 104 on-ramp from US97 (Biggs) Testing 8/Testing 9 Effective January 16, 2019, the eastbound I-84 on-ramp from US97 (Exit 104) will be restricted to 16 feet 00 inches in width at all hours.
Last Updated
6/25/2022 10:00 AM

I-84: MP 108 to 103.75

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 104.20 to MP 105.30 (Biggs) Effective January 16, 2019, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width at all hours.
Last Updated
6/25/2022 10:00 AM

I-84: MP 109.68

Commercial Vehicle Information
Informational only
Details
I-84 WB Exit 109 on-ramp from John Day Dam (Rufus) Effective January 16, 2019, the I-84 westbound on-ramp from John Day Dam (Exit 109) will be restricted to 16 feet 00 inches in width at all hours.
Last Updated
6/25/2022 10:00 AM

I-84: MP 109.76

Commercial Vehicle Information
Informational only
Details
I-84 EB Exit 109 off-ramp to John Day Dam (Rufus) Effective January 16, 2019, the I-84 eastbound off-ramp to John Day Dam (Exit 109) will be restricted to 16 feet 00 inches in width at all hours.
Last Updated
6/25/2022 10:00 AM

I-84: MP 114.13 to 109.02

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 109.25 to MP 110.50 (Rufus) Effective January 16, 2019, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width at all hours.
Last Updated
6/25/2022 10:00 AM

I-84: MP 114.13 to 99.85

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 100.00 to MP 112.00 (Biggs Junction) Effective February 25, 2019, this section of I-84 eastbound and westbound will be restricted to 20 feet 00 inches in width Monday through Friday between the hours of 5 AM & 10 PM. Loads wider than 20 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
6/25/2022 10:00 AM

I-84: MP 152.002 to 101.68

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 100.00 to MP 152.00 Effective January 16, 2019 this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width at all hours. Loads wider than 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
6/25/2022 10:00 AM

I-84: WB MP 221

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder
Comments
A hazardous materials cleanup is causing minimal delay. Use caution.
Last Updated
6/07/2022 10:29 AM

I-84: EB MP 237.6 to 248.5

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes , Shoulder (Eastbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Watch for lane closures. Expect delays. Speed reduction to 50 MPH in the work zone. Use caution.
Last Updated
6/07/2022 6:55 AM

I-84: MP 256.4

Commercial Vehicle Information
Informational only
Details
I-84 MP 256.42 Upper Perry Interchange crossing over I-84 (Perry) Upper Perry Interchange crossing over I-84 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
6/25/2022 10:00 AM

I-84: EB MP 264.29

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution.
Last Updated
4/11/2022 1:59 PM

I-84: MP 280.53

Commercial Vehicle Information
Informational only
Details
I-84 MP 280.53 McCanse Rd crossing over I-84 (west of Baker City) Effective March 5, 2018, McCanse Rd crossing over I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop traffic.
Last Updated
6/25/2022 10:00 AM

I-84: MP 291.65

Commercial Vehicle Information
Informational only
Details
I-84 MP 291.65 Charles Green Ln crossing over I-84 (west of Baker City) Effective March 5, 2018, Charles Green Ln crossing over I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop traffic.
Last Updated
6/25/2022 10:00 AM

I-84: MP 295.67

Commercial Vehicle Information
Informational only
Details
I-84 MP 295.67 Culley Ln crossing over I-84 (west of Baker City) Effective March 5, 2018, Culley Ln crossing over I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop traffic.
Last Updated
6/25/2022 10:00 AM

US101: MP 4.78

Commercial Vehicle Information
Informational only
Details
US101 Business MP 4.78 (Lewis & Clark River Bridge - Astoria) US101 Business crossing Lewis & Clark River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Last Updated
6/25/2022 10:00 AM

US101: MP 4.91

Commercial Vehicle Information
Informational only
Details
US101 NB & SB MP 4.53 to MP 5.33 (New Young's Bay Bridge - Astoria) Effective February 15, 2019, this section of US101 northbound and southbound will be restricted to 13 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5:30 AM. Loads wider than 13 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for more information.
Last Updated
6/25/2022 10:00 AM

US101: MP 5.3 to 6.8

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Staged Intersection Work is occurring and may restrict Right Turn movement onto Harbor Drive and Neptune Drive. Nightly Lane Closures are anticipated Sunday evening through Friday morning. Flaggers will be used to control traffic around the work zone. Expect delays of up to 20 minutes during lane closure and staged work activities. A 21 day, nightly full closure of the New Youngs Bay Bridge from 9 p.m. to 6 a.m. is allowed for roadway construction beginning in June.
Last Updated
6/06/2022 8:25 AM

US101: MP 6.89

Commercial Vehicle Information
Informational only
Details
US101 Business MP 6.89 (Old Youngs Bay Bridge - Astoria) Effective November 10, 2009, US101 Business crossing the Old Youngs Bay Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2.
Last Updated
6/25/2022 10:00 AM

US101: MP 28.7 to 32.4

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. Paving preservation project from Ecola Creek to Arcadia Beach. Expect delays of up to 20 minutes during lane closure activities. Bridge locations will be narrowed, eliminating either northbound or southbound shoulder access for pedestrians and bicyclists. Nightly lane closures are anticipated Sunday evening through Friday morning. Flaggers will control traffic around the work zone. The bridge locations will have temporary concrete barrier installed, and temporary striping will guide the open lanes around the work zone. Initial project setup activities are occurring. A work zone behind the concrete barrier at the bridge locations will be installed and maintained until the bridge rail reconstruction is completed.
Last Updated
6/02/2022 6:07 AM

US101: MP 79.61

Commercial Vehicle Information
Informational only
Details
US101 MP 79.61 (Beaver Creek Bridge - Beaver) Effective January 4, 2019, US101 crossing Beaver Creek Bridge at MP 76.61 is restricted to the following weights: 28 tons for SU5 vehicles (5 axle single-unit trucks); 29 tons for SU6 vehicles (6axle single-unit trucks); 30 tons for SU7 (7 axle single-unit trucks).
Last Updated
6/25/2022 10:00 AM

US101: MP 114.88

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution. The remaining work will be done at night and is weather dependent. It includes installing a concrete surfacing to the bridge, paving at the bridge ends, and striping. There is also a small amount of coating work to finish on the bridge rail posts.
Last Updated
5/27/2022 6:51 AM

US101: MP 141.44 to 141.83

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution. Expect intermittent single lane closures on the bridge at night and the east sidewalk will be closed for the duration of the project. Most work will be under the bridge and should not impact traffic.
Last Updated
6/02/2022 11:05 PM

US101: MP 141.67

Commercial Vehicle Information
Informational only
Details
US101 MP 141.67 (Yaquina Bay Bridge - Newport) Effective March 1, 2013, the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights (up to Weight Table 5) may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop both northbound and southbound traffic. The rolling stop method is not allowed.
Last Updated
6/25/2022 10:00 AM

US101: MP 175 to 175.05

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Bridge work is occurring. Use caution. Expect minor delays. Work is happening during the day, typically 7 a.m. to 4 p.m.
Last Updated
6/01/2022 6:44 AM

US101: MP 190.98

Commercial Vehicle Information
Informational only
Details
US101 MP 190.98 (Siuslaw River Bridge - Florence) Effective March 17, 2003, the Siuslaw River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for non-divisible loads.
Last Updated
6/25/2022 10:00 AM

US101: MP 233.4 to 234.6

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Road construction is occurring. Use caution.
Last Updated
5/23/2022 9:31 PM

US101: MP 311.4

Commercial Vehicle Information
Informational only
Details
US101 MP 311.40 (Reinhart Creek Bridge - south of Port Orford) Effective March 1, 2017, US101 crossing the Reinhart Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop oncoming traffic and straddle the centerline. Certified flaggers are required to stop oncoming traffic. Effective May 5, 2017, during construction, on-site certified flaggers may be provided to the carrier at no cost on a case-by-case basis during construction hours. Contact the Over-Dimension Permit Unit for information.
Last Updated
6/25/2022 10:00 AM

US101: MP 326.47

Commercial Vehicle Information
Informational only
Details
US101 MP 326.47 (Connector Road Bridge - Gold Beach) Effective January 14, 2019, US101 crossing Connector Road Bridge at MP 326.47 is restricted to the following weights: 28 tons for SU5 vehicles (5 axle single-unit trucks); 29 tons for SU6 vehicles (6 axle single-unit trucks); 32 tons for SU7 vehicles (7 axle single-unit trucks).
Last Updated
6/25/2022 10:00 AM

US101: MP 347.78

Commercial Vehicle Information
Informational only
Details
US101 MP 347.78 NB & SB (north of Brookings) Effective July 31, 2017, this section of US101 will be restricted to 16 feet 00 in. in width.
Last Updated
6/25/2022 10:00 AM

US197: MP 0.48 to 0.61

Construction Work
No to Minimum Delay
Comments
Single lane closures will take place overnight (Mon - Thursday); expect up to 20 minute delays while flaggers control traffic across the bridge.
Last Updated
6/07/2022 7:30 AM

US20: MP 3.56

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. ODOT will construct a single lane roundabout at the intersection of US20 and Ward/Hamby roads
Last Updated
6/07/2022 7:23 AM

US20: MP 13 to 18.01

Maintenance Work
No to Minimum Delay
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Road paving operations are occurring causing no to minimum delays. Use caution.
Last Updated
6/07/2022 5:38 PM

US20: MP 18.99 to 20.99

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 1 Lane (Southbound) Median , 1 Lane
Comments
Road construction is occurring. Use caution. Ramps Affected. Work consists of updates to the sidewalks, bike lanes and ADA ramps. Updates to the signals, illumination devices, and storm water and drainage features. Updates to the bus stop locations, installation of new signs, and the installation of rapid flashing beacon crosswalks.
Last Updated
6/07/2022 7:25 AM

US20: MP 26.64 to 30.35

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes , Shoulder (Eastbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Use caution. During construction expect delays up to 20 minutes. Work is expected to occur Monday through Friday, between 7:00am to 5:00pm.
Last Updated
5/16/2022 6:19 AM

US20: MP 30.2 to 30.8

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. During construction expect single lane closures and lane shifts. Work is expected to occur Monday through Friday, between 8:00am to 4:00pm.
Last Updated
4/28/2022 3:39 PM

US20: MP 55.5 to 56.5

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. 15' single lane restriction with flagging M-F 6AM-6PM, expect delays. One 15’ wide lane is available that can accommodate vehicles up to 12’ in width.
Last Updated
5/27/2022 6:52 AM

US20: MP 99.94

Commercial Vehicle Information
Informational only
Details
US20 MP 99.94 EB & WB (Sisters) Effective November 28, 2017, this section of US20 is restricted to 14 feet 00 inches in width and/or 154 feet overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet and/or 154 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
6/25/2022 10:00 AM

US20: MP 171.8 to 223.16

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring. Watch for lane closures. Use caution. Description of work: Traffic Control, Bridge Work, Paving, Chip seal and Guard rail.
Last Updated
5/30/2022 6:35 AM

US26: MP 8.22

Commercial Vehicle Information
Informational only
Details
US26 MP 8.22 (Little Humbug Creek Bridge - Necanicum Jct) Effective January 4, 2019, US26 crossing Little Humbug Creek Bridge at MP 8.22 is restricted to the following weights: 29 tons for SU5 vehicles (5 axle single-unit trucks); 30 tons for SU6 vehicles (6axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
6/25/2022 10:00 AM

US26: EB MP 24.51 to 22.89

Construction Work
No to Minimum Delay
Comments
Pedestrian detours, shoulder closures and lane shifts.
Last Updated
6/03/2022 2:25 PM

US26: MP 25.56 to 24.61

Construction Work
Estimated delay under 20 minutes
Comments
Around-the-clock single lane closure on U.S. 26 west. ODOT is installing a new sidewalk on the north side of U.S. 26 between Ten Eyck Road and Vista Loop Drive in Sandy.
Last Updated
6/07/2022 1:36 PM

US26: MP 42.67 to 44.02

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution.
Last Updated
6/08/2022 6:19 AM

US26: MP 47.5 to 52

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution.
Last Updated
6/08/2022 5:54 AM

US26: MP 66.43 to 112.91

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 2 Lanes , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring. Watch for single lane closures. Speed reduction to 40 MPH in the work zone. Use caution.
Last Updated
6/07/2022 7:28 AM

US30: MP 0.03

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 0.03 (Sandy River Bridge - Troutdale) Effective May 3, 2017, US30 (Historic Columbia River Highway) crossing the Sandy River Bridge is restricted to the following weights: 21 tons for Type 3 Vehicles (3-axle single-unit trucks); 19 tons for SU4 Vehicles (4-axle single-unit trucks); 21 tons for SU5, SU6 & SU7 Vehicles (5 to 7 axle single-unit trucks); 26 tons for Type 3S2 (truck tractor/semitrailer) and Type 3-3 (truck and trailer) Vehicles.
Last Updated
6/25/2022 10:00 AM

US30: MP 0.46

Commercial Vehicle Information
Informational only
Details
US30 (Huntington Hwy) MP 0.46 (Burnt River Bridge - Lime) Effective June 16, 2011, the Burnt River Bridge near Lime just off I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
6/25/2022 10:00 AM

US30: MP 2.82 to 4.91

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
6/07/2022 6:38 AM

US30: WB MP 3.1

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
6/07/2022 6:59 AM

US30: MP 3.94 to 6.51

Construction Work
Estimated delay under 20 minutes
Comments
Periodic daytime single lane closures. Pedestrian detours. We are making safety improvements for people walking, biking, rolling, driving and moving freight on U.S. 30 (NW St. Helens Road), between NW Bridge Avenue and NW Kittridge Avenue. We are repaving the roadway, replacing traffic signals, adjusting vehicle lane widths, building curb ramps to meet Americans with Disabilities Act (ADA) requirements and improving conditions for people biking.
Last Updated
6/03/2022 2:25 PM

US30: MP 4.6 to 3.29

Commercial Vehicle Information
Informational only
Details
US30 Bypass EB & WB MP 3.30 to MP 4.60 (Portland) Effective February 24, 2019, this section of US30 Bypass eastbound and westbound will be restricted to 12 feet 00 inches in width between the hours of 7 PM & 6 AM.
Last Updated
6/25/2022 10:00 AM

US30: MP 13.14

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 13.14 (Shepperds Dell Bridge) US30 (Historic Columbia River Hwy) crossing Youngs Creek (Shepperds Dell) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Last Updated
6/25/2022 10:00 AM

US30: MP 17.68

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 17.68 (West Multnomah Falls Bridge) US30 (Historic Columbia River Hwy) crossing West Multnomah Falls Bridge is restricted to 28,000 lbs. for solo vehicles, 44,000 lbs. for 3-2 combinations, and 56,000 lbs. for 3-3 combinations.
Last Updated
6/25/2022 10:00 AM

US30: MP 20.39

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 20.39 (Horsetail Creek Bridge) US30 (Historic Columbia River Hwy) crossing Horsetail Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.
Last Updated
6/25/2022 10:00 AM

US30: MP 30.42

Commercial Vehicle Information
Informational only
Details
US30 MP 30.42 (Bridge of the Gods - Cascade Locks) Effective December 24, 2013, the Bridge of the Gods at US30 MP 30.42 is restricted to 80,000 lbs. GVW, Weight Table 1. This bridge belongs to the Port of Cascade Locks.
Last Updated
6/25/2022 10:00 AM

US30: MP 48.67

Commercial Vehicle Information
Informational only
Details
US30 OR/WA Border at Rainier (Lewis & Clark Bridge) The Columbia River (Lewis & Clark) Bridge between Rainier, OR and Longview, WA is restricted to 21,500 lbs. per axle, no gross weight restriction. Contact the State of Washington at (360) 704-6340 for current information regarding size restrictions for this bridge.
Last Updated
6/25/2022 10:00 AM

US30: MP 51.24 to 52.04

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
6/07/2022 6:45 AM

US30: MP 60.82 to 60.94

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution.
Last Updated
5/29/2022 6:41 PM

US30BY: MP 3 to 5

Construction Work
No to Minimum Delay
Comments
Periodic daytime lane and shoulder closures. Periodic daytime lane closures. Pedestrian detours.
Last Updated
6/03/2022 2:26 PM

US395: MP 0.6 to 0.85

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
5/30/2022 6:45 AM

US395: MP 6.03 to 12.42

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
6/07/2022 6:19 AM

US97: MP 0.39

Commercial Vehicle Information
Informational only
Details
US97 NB & SB MP 0.28 to MP 0.52 (Biggs Junction) Effective January 1, 2019, this section of US97 northbound and southbound will be restricted to 18 feet 00 inches in width.
Last Updated
6/25/2022 10:00 AM

US97: MP 75.04 to 74.26

Commercial Vehicle Information
Informational only
Details
US97 NB & SB MP 74.09 to MP 75.18 (Madras) Effective October 22, 2018, this section of US97 northbound and southbound will be restricted to 17 feet 00 inches in width.
Last Updated
6/25/2022 10:00 AM

US97: MP 124.4 to 133.51

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) Median , 2 Lanes , Shoulder (Southbound) Median , 2 Lanes , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Watch for lane closures from 7pm to 7am. Use caution. Deceleration lanes at Quarry Ave and 61st St from US97 Southbound. Acceleration lane from 61st St to US97 southbound to provide greater merge distance, median barrier installation south of the Tumalo Road Interchange. A turn around from US97 southbound to northbound.
Last Updated
6/07/2022 7:21 AM

US97: SB MP 143.5 to 146.2

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
6/07/2022 2:27 PM

US97: SB MP 143.68 to 164.17

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 2 Lanes , Shoulder (Southbound) Median , 2 Lanes , Shoulder
Comments
Road construction is occurring. Watch for single lane closures. Expect up to 20 minute delays. Use caution. ODOT will be installing Road and Weather Information System (RWIS), speed sensors, travel time readers and changeable message signs.
Last Updated
5/26/2022 9:13 AM

US97: NB MP 153.11 to 156.26

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) Median , 2 Lanes , Shoulder (Southbound) Median , 2 Lanes , Shoulder
Comments
Road construction is occurring causing no to minimum delays. Use caution. Project: Construction of 2 lane NB alignment to extend the divided section. Construct 2 wildlife undercrossing bridges. Install wildlife fencing. Construction of new intersection of US97 and Vandevert Rd.
Last Updated
6/07/2022 7:09 AM

ORE10: MP 5.88 to 7.22

Construction Work
No to Minimum Delay
Comments
Flaggers directing traffic with lane and shoulder closures. Pedestrian detours.
Last Updated
6/03/2022 2:30 PM

ORE104: MP 4.62

Commercial Vehicle Information
Informational only
Details
OR104 Spur MP 4.62 (Skipanon River Bridge - Warrenton) Effective April 4, 2011, OR104 Spur crossing the Skipanon River Bridge is restricted to 38,000 lbs. for solo trucks, 56,000 lbs. for 3-2 axle truck combinations, 64,000 lbs. for 3-3 axle (or more) truck combinations.
Last Updated
6/25/2022 10:00 AM

ORE120: MP 0.38

Commercial Vehicle Information
Informational only
Details
OR120 (Swift Hwy / Portland Rd) MP 0.38 (Columbia Slough Bridge - Portland) OR120 (Swift Hwy / Portland Rd) crossing Columbia Slough Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
6/25/2022 10:00 AM

ORE126: MP 15.84

Commercial Vehicle Information
Informational only
Details
OR126 EB & WB MP 15.84 (Prineville) Effective June 21, 2018, this section of OR126 eastbound and westbound will be restricted to 14 feet 00 inches in width and 135 feet 00 inches in overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet or 135 feet in overall length may be accommodated on a case by case basis. Contact the OD Permit Unit for information.
Last Updated
6/25/2022 10:00 AM

ORE126: MP 32.4 to 31.56

Commercial Vehicle Information
Informational only
Details
OR126 EB & WB MP 31.56 to MP 32.36 (Walton) Effective February 06, 2019, this section of OR126 eastbound and westbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 11 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
6/25/2022 10:00 AM

ORE130: MP 3.23

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 3.23 (Panther Creek Bridge) OR130 (Little Nestucca Hwy) crossing Panther Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
6/25/2022 10:00 AM

ORE130: MP 3.6

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 3.60 (Squaw Creek Bridge) OR130 (Little Nestucca Hwy) crossing Squaw Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
6/25/2022 10:00 AM

ORE130: MP 3.82

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 3.82 (Austin Creek Bridge) OR130 (Little Nestucca Hwy) crossing Austin Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
6/25/2022 10:00 AM

ORE130: MP 4.15

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 4.15 (Little Nestucca River Bridge) OR130 (Little Nestucca Hwy) crossing Little Nestucca River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
6/25/2022 10:00 AM

ORE130: MP 4.76

Commercial Vehicle Information
Informational only
Details
OR130 (Little Nestucca Hwy) MP 4.76 (Bear Creek Bridge) OR130 (Little Nestucca Hwy) crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.
Last Updated
6/25/2022 10:00 AM

ORE130: MP 8.52 to 4.15

Commercial Vehicle Information
Informational only
Details
OR130 EB & WB MP 4.15 to MP 8 (Hebo) Effective February 26, 2019, this section of OR130 eastbound and westbound will be closed between the hours of 8 AM & 4 PM.
Last Updated
6/25/2022 10:00 AM

ORE164: MP 6.24

Commercial Vehicle Information
Informational only
Details
OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge - Jefferson) OR164 crossing the Santiam River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW. Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
6/25/2022 10:00 AM

ORE18: MP 51.57

Commercial Vehicle Information
Informational only
Details
OR18 MP 51.57 (Yamhill River Bridge - Dayton) OR18 crossing Yamhill River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
6/25/2022 10:00 AM

ORE204: MP 40.3 to 40.73

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
6/07/2022 6:34 AM

ORE211: MP 12.3 to 13.4

Construction Work
No to Minimum Delay
Comments
Shoulder closures with lane shifts. Pedestrian detours.
Last Updated
6/03/2022 2:38 PM

ORE213: MP 2.52

Construction Work
No to Minimum Delay
Comments
Sidewalk closures with pedestrian detours on SE 82nd Avenue at SE Mitchell Street. ODOT is installing pedestrian flashing beacons on 82nd Avenue at NE Pacific Street and SE Mitchell Street in Portland, on OR 99E at SE Boardman and Hull Avenues in Clackamas County, and on OR 8 at 12th Avenue in Cornelius.
Last Updated
5/27/2022 2:06 PM

ORE213: MP 5.6

Construction Work
No to Minimum Delay
Comments
Sidewalk closures with pedestrian detours on SE 82nd Avenue at SE Mitchell Street. ODOT is installing pedestrian flashing beacons on 82nd Avenue at NE Pacific Street and SE Mitchell Street in Portland, on OR 99E at SE Boardman and Hull Avenues in Clackamas County, and on OR 8 at 12th Avenue in Cornelius.
Last Updated
6/03/2022 2:42 PM

ORE214: MP 39.7 to 40.1

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) Median , 1 Lane , Shoulder (Northbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. Lane shifts and flaggers may cause delays up to 20 minutes Monday through Friday 9:00 a.m. to 2:00 p.m.
Last Updated
5/27/2022 6:50 AM

ORE217: NB MP 1.25 to 6.25

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime single lane closures in both directions Tuesday through Friday nights. Left-turns closed to/from the Allen Boulevard southbound ramps 24/7 through June 2022. Auxiliary lane closures. 24/7 Auxiliary lane closures on OR 217 south between Greenburg Road and OR 99W, north between Hall Boulevard and Denney Road. Daytime shoulder closures on OR 217 and on the following local roads near the highway ramps: Allen Boulevard, Hall Boulevard, Scholls Ferry Road and Greenburg Road. Ramps temporarily narrowed. Short-term pedestrian detours on the north side of Hall Boulevard near Cascade Avenue.
Last Updated
6/03/2022 2:43 PM

ORE219: MP 23.46

Commercial Vehicle Information
Informational only
Details
OR219 MP 23.46 (Willamette River Bridge - south of Newberg) OR219 crossing Willamette River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle. 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
6/25/2022 10:00 AM

ORE22: MP 1.47

Commercial Vehicle Information
Informational only
Details
OR22 MP 1.47 (Cedar Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Cedar Creek Bridge at MP 1.47 is restricted to the following weights: 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
6/25/2022 10:00 AM

ORE22: MP 5.81

Commercial Vehicle Information
Informational only
Details
OR22 MP 5.81 (Alder Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Alder Creek Bridge at MP 5.81 is restricted to the following weights: 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
6/25/2022 10:00 AM

ORE22: MP 7.19

Commercial Vehicle Information
Informational only
Details
OR22 MP 7.19 (Buck Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Buck Creek Bridge at MP 7.19 is restricted to the following weights: 29 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 34 tons for SU7 (7 axle single-unit trucks).
Last Updated
6/25/2022 10:00 AM

ORE22: MP 7.32

Commercial Vehicle Information
Informational only
Details
OR22 MP 7.32 (Alder Creek Bridge - west of Dolph) Effective January 4, 2019, OR22 crossing Alder Creek Bridge at MP 7.32 is restricted to the following weights: 30 tons for SU5 vehicles (5 axle single-unit trucks); 33 tons for SU6 vehicles (6 axle single-unit trucks); 36 tons for SU7 (7 axle single-unit trucks).
Last Updated
6/25/2022 10:00 AM

ORE22: MP 10.49

Commercial Vehicle Information
Informational only
Details
OR22 MP 10.49 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Last Updated
6/25/2022 10:00 AM

ORE22: MP 10.66

Commercial Vehicle Information
Informational only
Details
OR22 MP 10.66 (Louie Creek Bridge - Dolph) OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.
Last Updated
6/25/2022 10:00 AM

ORE22: MP 30.03

Commercial Vehicle Information
Informational only
Details
Santiam River Bridge - Mill City (not on OR22 mainline) 1st St crossing Santiam River Bridge in Mill City is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2. This restriction is NOT on the OR22 mainline.
Last Updated
6/25/2022 10:00 AM

ORE221: MP 20.78

Commercial Vehicle Information
Informational only
Details
OR221 SB MP 20.78 (Salem) Effective February 28, 2019, this section of OR221 southbound will be restricted to 10 feet 00 inches in width between the hours of 9 PM & 4 AM.
Last Updated
6/25/2022 10:00 AM

ORE223: MP 10.11

Commercial Vehicle Information
Informational only
Details
OR223 MP 10.11 (Little Luckiamute River Bridge - south of Dallas) Effective November 29, 2018, OR223 crossing Little Luckiamute River Bridge at MP 10.11 is restricted to the following weights: 28 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 29 tons for SU7 (7 axle single-unit trucks).
Last Updated
6/25/2022 10:00 AM

ORE228: MP 20.59 to 21.38

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
4/21/2022 3:09 PM

ORE234: MP 0.04

Commercial Vehicle Information
Informational only
Details
OR234 MP 0.04 (Rogue River Bridge - west of Gold Hill) OR234 crossing Rogue River Bridge west of Gold Hill is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3 for non-divisible loads.
Last Updated
6/25/2022 10:00 AM

ORE241: MP 0.51

Commercial Vehicle Information
Informational only
Details
OR241 MP 0.51 (Isthmus Slough) MP 0.51 Isthmus Slough (1/2 mile from US101) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW., Weight Table 1
Last Updated
6/25/2022 10:00 AM

ORE27: MP 1.9

Commercial Vehicle Information
Informational only
Details
OR27 MP 1.90 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 1.90 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
6/25/2022 10:00 AM

ORE27: MP 2.88

Commercial Vehicle Information
Informational only
Details
OR27 MP 2.88 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 2.88 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
6/25/2022 10:00 AM

ORE27: MP 4.62

Commercial Vehicle Information
Informational only
Details
OR27 MP 4.62 (Irrigation Ditch - Prineville) OR27 crossing Irrigation Ditch at MP 4.62 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
6/25/2022 10:00 AM

ORE27: MP 27.23

Commercial Vehicle Information
Informational only
Details
OR27 MP 27.23 (Bear Creek Bridge - south of Prineville) OR27 crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs GVW, Weight Table 2.
Last Updated
6/25/2022 10:00 AM

ORE339: MP 2.76

Commercial Vehicle Information
Informational only
Details
OR339 (Freewater Hwy) MP 2.76 (West Crockett Branch Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing West Crockett Branch Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
6/25/2022 10:00 AM

ORE339: MP 3.16

Commercial Vehicle Information
Informational only
Details
OR339 (Freewater Hwy) MP 3.16 (East Fork Little Walla Walla River Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing East Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
6/25/2022 10:00 AM

ORE339: MP 3.31

Commercial Vehicle Information
Informational only
Details
OR339 (Freewater Hwy) MP 3.31 (West Fork Little Walla Walla River Bridge - Milton-Freewater) OR339 (Freewater Hwy) crossing West Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.
Last Updated
6/25/2022 10:00 AM

ORE34: MP 0.13

Commercial Vehicle Information
Informational only
Details
Old OR34 EB MP 0.13 (Willamette River / Van Buren St Bridge - Corvallis) Old OR34 eastbound crossing Willamette River (Van Buren St) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW., Weight Table 1.
Last Updated
6/25/2022 10:00 AM

ORE35: MP 101.82

Commercial Vehicle Information
Informational only
Details
OR35 crossing Columbia River (White Salmon) Bridge - Hood River OR35 crossing the Columbia River (White Salmon) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1. Bridge belongs to Port of Hood River.
Last Updated
6/25/2022 10:00 AM

ORE43: MP 11.43

Commercial Vehicle Information
Informational only
Details
OR43 MP 11.43 (Willamette River Arch Bridge - Oregon City) OR43 crossing the Willamette River Arch Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
Last Updated
6/25/2022 10:00 AM

ORE47: MP 82.6

Maintenance Work
Closure
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Bridge work has the highway closed. Use alternate routes. Northbound traffic can take OR 6 to southbound U.S. 26, use Exit 55 onto NW Dersham Road and left onto northbound U.S. 26. Southbound traffic can take U.S. 26 to OR 6.
Last Updated
5/24/2022 9:03 AM

ORE47: MP 88.05

Commercial Vehicle Information
Informational only
Details
OR47 MP 88.05 NB & SB (Forest Grove) Effective September 27, 2016, this section of OR47 is restricted to 14 feet 00 inches in width and 135 feet overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet or 135 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
6/25/2022 10:00 AM

ORE53: MP 5.981

Commercial Vehicle Information
Informational only
Details
OR53 MP 5.98 (Jack Horner Creek Bridge) OR53 crossing Jack Horner Creek Bridge is restricted to 20,000 lbs. single axle, 40,000 lbs tandem axle, Weight Table 3.
Last Updated
6/25/2022 10:00 AM

ORE551: MP 3.48

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. Expect the following lane closures on OR 99E, Ehlen Road and Boones Ferry Road: Daily, Monday through Friday between 9 a.m. and 3 p.m. Nightly, Sunday night through Friday morning, between 7 p.m and 5 a.m.???
Last Updated
6/07/2022 11:36 AM

ORE569: MP 9.89

Commercial Vehicle Information
Informational only
Details
OR569 EB Exit to Delta Hwy SB (Eugene) test update Effective February 10, 2019, the OR569 eastbound off-ramp to Delta Hwy southbound will be closed for one day only between the hours of 6 AM & 11 AM.
Last Updated
6/25/2022 10:00 AM

ORE7: MP 49.2 to 52.04

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
5/24/2022 11:09 AM

ORE8: MP 11.73 to 11.71

Construction Work
Estimated delay under 20 minutes
Comments
Access to River Road from OR 8 closed with left turns restricted at the intersection through June 15. Periodic nighttime lane closures on OR 8. Periodic nighttime lane closures on OR 8. Pedestrian detour shuttle. The 16-day detour at the OR 8 and River Road intersection is in place until 8 p.m. on June 15. During this time, people moving between OR 8 and River Road and between SE 13th Avenue and River Road are being detoured to SE Minter Bridge Road. Left and right turns are not being permitted onto River Road from OR 8. People making left turns to and from SE 13th Avenue are being detoured to SE Maple Street or SE 21st Ave. Left turns are not being permitted between SE 13th Avenue and OR 8. Crosswalks are closed at the OR 8 and River Road intersection and a 24-hour shuttle is moving pedestrians from one side of the intersection to the other.
Last Updated
6/03/2022 2:29 PM

ORE8: WB MP 16.55

Construction Work
Informational only
Comments
No traffic impacts. ODOT is installing pedestrian flashing beacons on 82nd Avenue at NE Pacific Street and SE Mitchell Street in Portland, on OR 99E at SE Boardman and Hull Avenues in Clackamas County, and on OR 8 at 12th Avenue in Cornelius.
Last Updated
6/03/2022 2:29 PM

ORE82: MP 1.29

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
6/07/2022 6:38 AM

ORE82: MP 1.74 to 2.49

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
6/07/2022 6:37 AM

ORE82: MP 11.98 to 12.45

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
6/07/2022 6:36 AM

ORE82: MP 19.62 to 20.56

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution.
Last Updated
6/07/2022 6:35 AM

ORE82: MP 45.6 to 46.1

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Expect up to a 20 minute delay. Use caution. The contractor will begin tree removal this week. There may be intermittent flagging with up to 20 minute delays all week.
Last Updated
6/07/2022 6:56 AM

ORE82: MP 46.78 to 55.05

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing no to minimum delays. Use caution. Project consists of upgrading the ADA ramps at various corners throughout Lostine and Wallowa.
Last Updated
6/07/2022 6:31 AM

ORE86: MP 10 to 70

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
A chip seal operation is occurring. Watch for loose rock.
Last Updated
6/06/2022 9:22 AM

ORE86: MP 40.64

Commercial Vehicle Information
Informational only
Details
OR86 MP 40.64 (Eagle Creek Bridge - Richland) Effective October 20, 2016, all single-trip permit holders over continuous trip permit weights must stop all traffic, straddle centerline, and be the only vehicle on bridge when crossing.
Last Updated
6/25/2022 10:00 AM

ORE99: MP 62.31 to 63.79

Commercial Vehicle Information
Informational only
Details
OR99W NB & SB MP 62.03 to MP 63.90 (Monmouth) Effective August 1, 2018, this section of OR99W northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 6 AM. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information.
Last Updated
6/25/2022 10:00 AM

ORE99E: MP -3.99 to -3.8

Construction Work
No to Minimum Delay
Comments
No traffic impacts.
Last Updated
6/03/2022 2:30 PM

ORE99E: MP 9.51 to 9.97

Construction Work
No to Minimum Delay
Comments
Single lane closures weekdays at Boardman and Hull Avenues. ODOT is installing pedestrian flashing beacons on 82nd Avenue at NE Pacific Street and SE Mitchell Street in Portland, on OR 99E at SE Boardman and Hull Avenues in Clackamas County, and on OR 8 at 12th Avenue in Cornelius.
Last Updated
6/03/2022 2:33 PM

ORE99W: MP 5.86 to 6.54

Construction Work
No to Minimum Delay
Comments
Periodically flaggers direct traffic at night. Daytime and nighttime single lane closures. Shoulder and sidewalk closures with pedestrian detours.
Last Updated
6/03/2022 2:37 PM

ORE99W: NB MP 84.28

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Traffic signal and ADA ramp work is occurring at Crystal Lake Dr. & OR99W. Lane closures and occasion flagging may occur at night. Bikes may be in the roadway from curb ramp work.
Last Updated
5/26/2022 6:10 AM